CIGAR LAKE

PUMP STATION

 

Project Detail

Size/Type:

10 MGD ADF / Pump Station

3,040 SF / Pump Station Building

 

Services:

ARCHITECTURE

STRUCTURAL

PERMITTING

SURVEY

M/E/P

CIVIL SITE DESIGN

Contact Info

500 West Fulton Street

Sanford, FL 32771

(866) 609-0688

info@cphcorp.com

Mon - Fri 8:00 - 5:00

Cigar Lake Pump Station

  • 40’ x 76’ Building Including a Pump Room, an Electrical Room, and a Chemical Feed Room.
  • 3 Horizontal Split Case Centrifugal Pumps, Tumble Disk Filter System, an Air Compressor, and a Vacuum System for the Pump Priming
  • The Chemical Feed Room Has Two 500 GST for Sodium Hypochlorite and a Chemical Feed Pump Skid
  • 10 MGD ADF Capacity
  • Gravity Sewer Lines to Support the Splash Pad, Additional Sidewalks Adjacent to the New Splash Pad, County, and FDOH Permitting

Back to Projects

CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a direct result of the efforts of our staff and our successful relationship with our clients. Our ability to incorporate learned experiences and procedures into our operations helps our clients get the best product for their needs.

 

 

CALL US NOW

 

Toll Free: 866.609.0688

 

SEND US A MESSAGE

 

General: info@cphcorp.com