HAINES CITY WATER TREATMENT SYSTEM UPGRADES FOR CONTROL OF DISINFECTION BY-PRODUCTS (DBPS)

 

Project Detail

Size/Type:

XXXX / Water Treatment Plant

 

Services:

CEI

STRUCTURAL

PLANNING

PERMITTING

ENVIRONMENTAL

SURVEY

M/E/P

CIVIL SITE DESIGN

Contact Info

500 West Fulton Street

Sanford, FL 32771

(866) 609-0688

info@cphcorp.com

Mon - Fri 8:00 - 5:00

Haines City Water Treatment System Upgrades for Control of Disinfection By-Products (DBPs)

  • Control of Disinfection By-Products (DBPs) for Compliance with Stage 2 DBP Requirements
  • Target Goal of 60 µg/L for Trihalomethanes (THMs) and 40 µg/L for Haloacetic Acids (HAAs)
  • 3,600 GPM Ion- Exchange (IEX) Treatment System to Remove Total Organic Carbon (TOC)
  • Addition of Mixers in Two (2) 500,000 gallon GST to Reduce On-Site Water Age
  • Refurbish and Replace Chemical Feed Systems to Control Chlorine Dose Rates
  • Enhance SCADA Instrumentation & Control Improvements to Balance Distribution System Water Quality
  • Alternative Funding Through State funds and 85% Principal Forgiveness Grant

Back to Projects

CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a direct result of the efforts of our staff and our successful relationship with our clients. Our ability to incorporate learned experiences and procedures into our operations helps our clients get the best product for their needs.

 

 

CALL US NOW

 

Toll Free: 866.609.0688

 

SEND US A MESSAGE

 

General: info@cphcorp.com