JEA PONCE DE LEON WTP PUMP BUILDING

 

Project Detail

Size/Type:

0.865 MGD / Wastewater Pump Building

 

Services:

ENGINEERING

M/E/P

PLANNING

PERMITTING

Contact Info

500 West Fulton Street

Sanford, FL 32771

(866) 609-0688

info@cphcorp.com

Mon - Fri 8:00 - 5:00

JEA Ponce de Leon WTP Pump Building & Reservoir Replacement

  • One (1) 500,000 Gallon Pre-Stressed Concrete Ground Storage Tank with Cascade Tray Aerator and Vinyl Baffle Walls
  • Salvage of Existing 500,000 Gallon Steel Ground Storage Tank
  • New High Service Pump Building with a Monorail and Trolley System
  • Three High Service Pumps Operating on VFDs
  • New Sodium Hypochlorite Skid and Chlorine Analyzer Feed Room
  • Dual Containment, Injection Quills and Vault, and Optimization of the Chlorine Dosage
  • New Electrical Room
  • New Generator and Fuel Tank

Back to Projects

CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a direct result of the efforts of our staff and our successful relationship with our clients. Our ability to incorporate learned experiences and procedures into our operations helps our clients get the best product for their needs.

 

 

CALL US NOW

 

Toll Free: 866.609.0688

 

SEND US A MESSAGE

 

General: info@cphcorp.com