SANFORD NORTH WRF - BNR PROJECT

 

Project Detail

Size/Type:

7.30 MGD AADF / Wastewater

 

Services:

ENGINEERING

SURVEY

M/E/P

PLANNING

Contact Info

500 West Fulton Street

Sanford, FL 32771

(866) 609-0688

info@cphcorp.com

Mon - Fri 8:00 - 5:00

Sanford North WRF – Biological Nutrient Removal Project

  • New 7.3 MGD Biological Nutrient Removal (BNR) System
  • Advanced Wastewater Treatment to Meet the TN (< 3 Mg/L) and TP (< 0.6 Mg/L) Concentrations
  • Process Evalution And Analyses
  • Integrated Fixed-Film Activated Sludge (IFAS) Process
  • 20% Reduction of  Electrical Costs
  • New Ras/Was Pumping Systems
  • Primary Anoxic Basins (2-Stage)
  • Wastewater Step-Feed Process
  • Aerobic Basins
  • Deoxygenation Basins
  • Secondary Anoxic Basins
  • Reaeration Basins
  • Turbo Blowers (5 Units)
  • Chemical and Supplemental Carbon Storage/Handling Facilities
  • Aerobic Digestion System Improvements
  • Internal Recycle Systems

Back to Projects

CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a direct result of the efforts of our staff and our successful relationship with our clients. Our ability to incorporate learned experiences and procedures into our operations helps our clients get the best product for their needs.

 

 

CALL US NOW

 

Toll Free: 866.609.0688

 

SEND US A MESSAGE

 

General: info@cphcorp.com