WINTER SPRINGS WTP 1 SYSTEM UPGRADES FOR CONTROL OF  (DBPS)

 

Project Detail

Size/Type:

2700 GPM Ion- Exchange (IEX) / Water Treatment Plant

 

Services:

CEI

STRUCTURAL

PLANNING

PERMITTING

ENVIRONMENTAL

SURVEY

M/E/P

CIVIL SITE DESIGN

Contact Info

500 West Fulton Street

Sanford, FL 32771

(866) 609-0688

info@cphcorp.com

Mon - Fri 8:00 - 5:00

Winter Springs Water Treatment Plant 1 System Upgrades for Control of Disinfection By-Products (DBPs)

  • Control of Disinfection By-Products (DBPs) for Compliance with Stage 2 DBP Requirements
  • Target Goal of 60 µg/L for Trihalomethanes (THMs) and 40 µg/L for Haloacetic Acids (HAAs)
  • 2700 GPM Ion- Exchange (IEX) Treatment System to Remove Total Organic Carbon (TOC)
  • New Generator System
  • Refurbish and Replace Chemical Feed Systems to Control Chlorine Dose Rates
  • Enhance SCADA Instrumentation & Control Improvements to Balance Distribution System Water Quality
  • Alternative Funding Through State funds
  • Fast Tracked Project

Back to Projects

CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a direct result of the efforts of our staff and our successful relationship with our clients. Our ability to incorporate learned experiences and procedures into our operations helps our clients get the best product for their needs.

 

 

CALL US NOW

 

Toll Free: 866.609.0688

 

SEND US A MESSAGE

 

General: info@cphcorp.com